Sunday, October 19, 2008

Day 3, Part 2: Flight Commissioning, Bench Test & Aurora

As promised, here is part 2 of today's activities at Esrange. Range officials of the Swedish Space Corporation joined us today for the first "Bench Test" of the Rexus 4 systems and experiments. "Bench Testing" essentially means wiring up all components without actually assembling the rocket. Hence, it was an important static test which enabled us to test all systems not just separately, but in relation between MIRIAM's systems and the rocket itself. Before that was to happen, Hannes initiated a sequence of tests to commission MIRIAM for flight. Flight commissioning turned out to be quite eventful. The good news was that the CamCon error has been fixed yesterday. However, a version conflict resulted in some non-conformant behavior of the Service Module. After repeating the flight commissioning tests and analyzing the results, the errors were lastly fixed or worked around through the hard work of our software engineers, Daniel and Kevin. This enabled us to resume with flight commissioning and complete the bench test by the end of the day.

Trouble-Shooting MIRIAM at the preparation building.


In the control room, Daniel (back) and Kevin (front) are in constant communication with the preparation building while monitoring MIRIAM's mission control interfaces.


At last, MIRIAM is GO for flight commissioning.

The atmosphere during the bench test was quite charged. But in the end, while there is still some data to be evaluated, we can confidently confirm that MIRIAM has mastered the test successfully, transmitting images and sensor data without problems.


Christian is manning the TV control room during the bench test. While receiving imagery from MIRIAM, his job is to switch to the best image according to polarization and receiving station.


An overview of the control room during the bench test.



Speaking of charged atmosphere, it seems like the elements conspired to reward us for our efforts. After our dinner, a few of us discovered a faint glow in the sky while setting out a freshly baked cake to cool. Sure enough, a dazzling display of green Aurora Borealis ensued. Having checked the space weather reports in hopes of seeing this phenomenon, we knew there was a slight but better-than-usual chance to see them tonight, but it was still a surprising event. The event didn't last much longer than half an hour, with ever changing intensity, so the timing was perfect. We did manage to take a few pictures, albeit without stabilization in (obviously) low-light conditions. This was certainly a moment to be savored with our own eyes, and the pictures do not do them justice.




Aurora Borealis over Esrange



Day 3, Part 1: Radar Hill & Preparations for the Bench Test

Hello,


After breakfast, some of us climbed the "radar hill," the highest point on Esrange. The 45-minute climb by foot was rewarded with an excellent view of the range and is seeded with satellite tracking antennas. The isolated geography contrasted by the high-end technology was somewhat reminiscend of Star War's forest moon of Endor. After our walk, the excitement grew in anticipation of the "bench test," the first static full systems test of all Rexus 4 components and experiment. This will be the topic of the Part 2 post of the day.



About half-way to the top of the hill.




A large variety of tracking antennas line the face of the hill.

Me on top of the hill. You can see the launch site in the background




Radar and tracking equipment on top of the radar hill.




Back at the preparation building, the team prepares for the bench test.

Part 2 of the bench test will be posted later tonight, so stay tuned.

Saturday, October 18, 2008

Day 2: Shopping Adventure and Camera Testing

Hello again,

First, I have updated yesterday's post with pictures, so feel free to take a look. The second day at Esrange began with with a moment of classic jetlagged disorientation, forcing me to take a second to figure out where I was, what time it was and what I was suposed to be doing when I got up. Once I got my bearings, we met up for breakfast at the main building and I joined a group for a shopping adventure to Kiruna. We are expecting more than 18 people and visitors of our group at launch day, and while Esrange provides some meals, we needed a lot more supplies. On the way there, we took advantage of the beautiful weather to take some landscape pictures:




The shopping trip took us quite bit longer than we initally thought, as trying to please everyones taste while finding groceries in a foreign language proved to be more difficult than we realized. When we returned in the afternoon, Hannes, the project leader, was already busy testing some of MIRIAM's systems. Today, most of that focused on the camera module. Since there will be several camera systems on board, let me explain each of them and their function.

There is one camera in the instrument pod of balloon itself which will image the separtion from the sounding rocket and the atmospheric entry from the balloon's perspective. There are also two cameras on deplyable arms on the service module which will monitor the inflation of the balloon and ejection of balloon/instrument pod from the service module. There is a third set of cameras which will stay behind on the sounding rocket interface to film the separation of the service module. Since the camera module, which includes a TV-camera and four digital recorders, remains on the rocket, it can be recovered after the launch to bevaluated later. As an interesting side-note, the digital recorders were salvaged from the previous "REGINA" sounding rocket experiment (which tested the ejection of the balloon without inflation). While the digital video recorders were initially considered "nice to have" rather than an essential feature, the team is still trying hard to make them work for us once again by troubleshooting software issues and rewiring some connections. The camera module's control computer, "CamCon" and the instrument pod control computer, "PodCon," communicate which each other through an IR system after separation. The camera systems are explained in the pictures below.


Camera Systems of the Service Module and the
instrument pod.

The camera module which remains on the rocket.

This is it for now, as I have to get ready for dinner. Lastly, just one more picture of the Esrange main building (where I am sitting right now).

The Esrange main building.

Friday, October 17, 2008

Day 1: Arrival at Esrange

---Post Updated with Pictures!---

Hello,

I finally arrived at Esrange this afternoon. The weather here is quite nice, with temperatures hovering around freezing and occasional light snow.


Flying over north Sweden.


Dusk at Esrange.

The flights went well, and while waiting for the flight to Kiruna at Stockholm, I ran into a familiar face of a team member from the UniBW, where I interned the past summer. There were also a few people on the flight from the MORABA (German: "Mobile Rocket Base") team from the German Aerospace Center who are providing the launch.


MORABA Engineers working the telemetry systems.


Disembarking at Kiruna.

The flight to Kiruna is basically only used by people bound to the Esrange facility or for local miners. Once we landed, it was obvious as to why that is. After disembarking on a tiny, snowy airfield, we were surrounded by nothing but boreal forrest and a few lakes. Don't get me wrong, the landscape is absolutely beautiful, but there isn't much around save for the few satellite dishes from Esrange and the naerby ESA satellite tracking station which could be seen from the airplane.

The ESA Satellite Tracking Sation seen on approach.


Arriving at the Esrange Gates.


After an approximately 20-minute drive we reached the Esrange gates. We got our security passes (during launch capaigns, everyone needs to be accounted for and sign into designated areas for range safety) and drove to the processing building where we met up with most of our team (except for Dany and Kevin, who were in the control room). We ran some basic tests on MIRIAM and chatted with people from the MORABA team and some of the other small experiments bound to launch on the REXUS 4 rocket. I also checked into my room at the on-site "Aurora" Hotel and toured the rest of the facilities. Although most of the team has been here for a few days, MIRIAM didn't arrive until yesterday due to some shipping delays. However, the system arrived in-tact and ready-to-go. Much testing and some reprogramming of the mission timers remains to be done, however, due to a small change in the trajectory. Because of this and weather considerations, we'll probably be expecting a launch on wednesday rather than tuesday.



MIRIAM is being prepared for her big day.


The assembly area was quite busy.

Later today, some of us drove to Kiruna, a good 30 minutes away, for dinner. I tried some reindeer meat and it was quite tasty. We'll be doing more testing tomorrow and go on a shopping trip for basic necessities. I think that'll be all for today, as it's getting late and I need to sleep out the jetlag and rest my back from far to many hours on planes.

Best,

-Andy

Wednesday, October 15, 2008

Welcome!

Welcome to the Archimedes blog!

Here, you will find updates on the Archimedes project and the MIRIAM technology demonstrator which will be launched on a sounding rocket from the ESRANGE facility near Kiruna, Sweden, next week.

I initially started this blog for my personal reflection and to document the trip to Sweden for friends, family and the Engineering Leadership Program of my University, which has kindly agreed to partially sponsor my trip. However, this blog may also be of interest to anyone following the project. You can learn more about me and my involvement with the Archimedes project in the "About Me" section.

I will leave for Sweden tomorrow and am planning to provide regular updates and images when I arrive. I will also introduce the rest of the team and provide more technical background information once I am there. In the mean time, if you would like to learn more about the project, please follow this link to the project's main page. You can also view the project abstracts on the right menu bar.

Best,

Andy